| Course: |
Asphalt Plant - Level II
|
| Objective: |
To assure that personnel operating or inspecting an asphalt production operation (at a plant) are familiar with FDOT specification requirements, good materials management, and equipment operation necessary to produce a superpave mixture which will meet the mix design criteria and mix production requirements.
|
| Course Content: |
- Aggregate Storage and Feeding Systems
- Asphalt Cement Supply Systems
- Aggregate Drying and Heating Systems
- Exhaust Fan Systems
- Emission Control Systems
- Production and Drying Efficiency
- Batch Type Facilities
- Surge Storage Equipment
|
| Duration of Class: |
Three days. Examination is at the end of the third day.
|
Examinations: |
Written Required. Multiple-choice, closed book, 2 hours.
Proficiency None Required.
|